Resilience investment optimizer

Ranked by highest modelled benefit based on current verified inputs. This is not an optimisation: any option with missing cost, capacity or operational constraints is shown with that gap named. Costs are internal rate-card values (rate-2026.02) and are visible for audit.

Recommended

Highest modelled benefit based on current verified inputs

Establish an approved transfer of 83K-1088 from Synthetic Saltillo Assembly — Frame Line — projected to move verified tolerance from 16.8h to 53.6h at Synthetic SC Assembly — Line SC-1 (body), for $62k over 25 days.

All investments

InvestmentTargetCostDaysCurrentProjectedGainExposure reducedDepsConfidenceOwner
Increase the 63X-1153 buffer at Synthetic SC Assembly to the approved 72h
Storage space confirmed at the plant; Supplier can build ahead without affecting current releases
Synthetic SC Assembly — Line SC-2 (final assembly)$264k2116h72h+56h$101.5M1ModerateK. Ruiz, Materials
Increase the 83K-1088 buffer at Synthetic SC Assembly to the approved 72h
Storage space confirmed at the plant; Supplier can build ahead without affecting current releases
Synthetic SC Assembly — Line SC-1 (body)$313k2116.8h91.6h+74.8h$141.8M1ModerateK. Ruiz, Materials
Establish an approved transfer of 83K-1088 from Synthetic Saltillo Assembly — Frame Line
Synthetic Saltillo Assembly — Frame Line retains 12h of its own cover; Transfer completes within 8h
Synthetic SC Assembly — Line SC-1 (body)$62k2516.8h53.6h+36.8h$69.7M2ModerateR. Okafor, Supply Chain
Increase the 13C-1184 buffer at Synthetic SC Assembly to the approved 72h
Storage space confirmed at the plant; Supplier can build ahead without affecting current releases
Synthetic SC Assembly — Line SC-1 (body)$232k2116.9h72h+55.1h$104.4M1LowK. Ruiz, Materials
Add tested EDI continuity for 2 critical message flow(s)
Trading-partner participation in the test; Clerical capacity for manual keying
Release and ASN exchange across all plants$240k70unknownnot calculable—$0k2ModerateJ. Lindqvist, ERP
Test recovery capability at 3 critical supplier(s)
Supplier agreement to be tested; Test scope approved by Continuity
Recovery assumptions used in every calculation$114k30unknownnot calculable—$0k3HighS. Bhatt, Continuity
Create and test manual procedures for 1 untested plan(s)
Named process owner; Plant participation in the exercise
Continuity capacity that may currently be counted as a claim$44k20unknownnot calculable—$0k1ModerateS. Bhatt, Continuity