Meridian Stamping

Tier 1 supplier resilience profile — what it supplies, what depends on it, and how well that is evidenced.

INC-2026-0113 · S1 · responding

Profile

Active incident4 single-source parts
Criticalitycritical
Sites3
Parts supplied10
Lines supported8
Programs supportedSynthetic X-Program SX-1, Synthetic Pickup Program, Synthetic X-Program SX-2, Synthetic Commercial Van Program
Cyber-risk score68/100
Last assessment2025-11-24
Recovery capabilitytested
Notification commitment4h
Evidence qualitystrong
Open remediation items0

Sites

  • Meridian Stamping — Toledo Plant 1Toledo, USAConfirmed
  • Meridian Stamping — Saltillo Plant 2Saltillo, MexicoConfirmed
  • Meridian Stamping — Kitchener Plant 3Kitchener, CanadaConfirmed

Alternate sources

  • 27A-1000 → Northbend Castings
    qualified · 36h activation · 480/day · validated 2026-01-12
  • 14Z-1025 → Belmont Die Casting
    partial · 96h activation · 260/day · validated 2025-05-10
  • 40Y-1050 → Weyland Forge
    unqualified · 240h activation · 150/day · never validated
  • 40W-1100 → Grayson Machining
    qualified · 48h activation · 620/day · validated 2026-02-17

Critical systems and connections

SystemTypeBusiness processRTOStatus
Meridian ERP (SAP ECC)ERPSupplier order management24hConfirmed
Meridian EDI GatewayEDIRelease & ASN exchange8hConfirmed
Meridian Shipping WMSWMSOutbound shipping12hConfirmed
Interfaces
  • IF-01 830 Planning Schedule — EDI, critical, manual fallback: documented
  • IF-02 862 Shipping Schedule — EDI, critical, manual fallback: documented
  • IF-03 856 ASN inbound — EDI, critical, manual fallback: tested
  • IF-04 810 Invoice — EDI, moderate, manual fallback: documented
  • IF-05 997 Functional ack — EDI, high, manual fallback: none
  • IF-06 PO replication — API, critical, manual fallback: none
  • IF-09 Label print feed — File, high, manual fallback: tested
  • IF-21 Partner tunnel — Meridian — API, critical, manual fallback: none
  • IF-25 Certificate of analysis — File, moderate, manual fallback: documented
  • IF-29 Shipment confirmation — API, high, manual fallback: documented

Supplied parts and current exposure

Dependency explorer →
PartCommoditySourceLineRunoutStatus
27A-1000Body side outer AStampingssingle-source
Frame Line
Line SC-1 (body)
44.1h
—
Unresolved
14Z-1025Door inner panel AWire harnesssingle-source
Line SC-2 (final assembly)
Final Trim 2
24.4h
71.5h
Confirmed
40Y-1050Battery tray AInjection moldingmulti-source
Line SC-3 (chassis)
28.3h
Confirmed
99X-1075Brake caliper ACastingssingle-source
Frame Line
Van Body Line
33.2h
98h
Confirmed
40W-1100Body side outer AElectronicsmulti-source
Final Trim 2
75.1h
Confirmed
66V-1125Door inner panel ASeatingmulti-source
Chassis Sub-assembly
84.4h
Probable
55U-1150Battery tray AFastenersmulti-source
Van Body Line
59.2h
Possible
50T-1175Brake caliper AGlassmulti-source
Compact Trim
28.2h
Confirmed
50S-1200Body side outer ABearingssingle-source
Line SC-1 (body)
52.3h
Possible
98R-1225Door inner panel ABrakemulti-source
Line SC-2 (final assembly)
22.4h
Possible