Recovery validation gates
Reconnection is a decision, not a status update. Each gate needs its requirement met, evidence attached and a named approver.
Recovery position
Reconnection cannot be authorised until every preceding gate has passed with evidence. Supplier recovery estimate: 72h (unverified supplier statement).
Gates
- 1
Affected environment identified
passedSupplier states which systems, sites and accounts were in scope, with dates.
Approver role: CISO Office · Evidence: EV-1 · passed by A. Fournier, CISO Office - 2
Containment completed
openPartner connectivity terminated and supplier confirms containment of the affected estate.
Approver role: CISO Office · Evidence: EV-8 - 3
Credentials rotated
blockedAll shared service accounts, keys and portal identities rotated on both sides.
Approver role: CISO Office · Evidence: none attachedBlocked by gate 2 - 4
Malicious persistence addressed
blockedEvidence that persistence mechanisms were removed and the estate rebuilt or cleaned.
Approver role: CISO Office · Evidence: none attachedBlocked by gate 3 - 5
Data integrity validated
blockedSupplier proves order, release and shipment data is complete and unaltered.
Approver role: ERP Owner · Evidence: none attachedBlocked by gate 4 - 6
Critical interface tested
blocked830, 862 and 856 exchanged successfully in a controlled test window.
Approver role: ERP Owner · Evidence: none attachedBlocked by gate 5 - 7
Business transaction completed
blockedOne real purchase order, release and receipt processed end to end.
Approver role: Supply Chain · Evidence: none attachedBlocked by gate 6 - 8
Production or service test passed
blockedReceived material consumed on line without sequencing or quality exception.
Approver role: Plant Ops · Evidence: none attachedBlocked by gate 7 - 9
Cybersecurity approval recorded
blockedNamed security approver signs off with evidence references.
Approver role: CISO Office · Evidence: none attachedBlocked by gate 8 - 10
Operational approval recorded
blockedNamed operations approver signs off on continuity exit.
Approver role: Plant Ops · Evidence: none attachedBlocked by gate 9 - 11
Reconnection authorised
blockedExecutive authorisation recorded; tunnel re-enabled under monitoring.
Approver role: Executive · Evidence: none attachedBlocked by gate 10
Continuity strategies in force
- Manual EDI processing — releases & ASNsScope SYS-05 / supplier EDI outage · RTO 8h · RPO 15m · manual capacity 220/dayPortal upload of 830/862 and keyed ASN entry, 2 clerks per shiftLast tested 2025-10-26
- Supplier isolation and re-onboardingScope SYS-18 partner connectivity · RTO 4h · RPO 0m · manual capacity 0/dayTerminate tunnel, rotate credentials, stage clean-room re-entryLast tested 2026-01-18
- SC Assembly body shop bank build-aheadScope PLT-1 stamping shortage · RTO 24h · RPO 60m · manual capacity 180/dayRun banked bodies, resequence Line SC-2 to the SX-2 mixNever tested — capacity figure is an assumption, not a proven capability