Recovery validation gates

Reconnection is a decision, not a status update. Each gate needs its requirement met, evidence attached and a named approver.

INC-2026-0113 · S1 · responding

Recovery position

Gates passed
1/11

Reconnection cannot be authorised until every preceding gate has passed with evidence. Supplier recovery estimate: 72h (unverified supplier statement).

Gates

  1. 1

    Affected environment identified

    passed

    Supplier states which systems, sites and accounts were in scope, with dates.

    Approver role: CISO Office · Evidence: EV-1 · passed by A. Fournier, CISO Office
  2. 2

    Containment completed

    open

    Partner connectivity terminated and supplier confirms containment of the affected estate.

    Approver role: CISO Office · Evidence: EV-8
  3. 3

    Credentials rotated

    blocked

    All shared service accounts, keys and portal identities rotated on both sides.

    Approver role: CISO Office · Evidence: none attached
    Blocked by gate 2
  4. 4

    Malicious persistence addressed

    blocked

    Evidence that persistence mechanisms were removed and the estate rebuilt or cleaned.

    Approver role: CISO Office · Evidence: none attached
    Blocked by gate 3
  5. 5

    Data integrity validated

    blocked

    Supplier proves order, release and shipment data is complete and unaltered.

    Approver role: ERP Owner · Evidence: none attached
    Blocked by gate 4
  6. 6

    Critical interface tested

    blocked

    830, 862 and 856 exchanged successfully in a controlled test window.

    Approver role: ERP Owner · Evidence: none attached
    Blocked by gate 5
  7. 7

    Business transaction completed

    blocked

    One real purchase order, release and receipt processed end to end.

    Approver role: Supply Chain · Evidence: none attached
    Blocked by gate 6
  8. 8

    Production or service test passed

    blocked

    Received material consumed on line without sequencing or quality exception.

    Approver role: Plant Ops · Evidence: none attached
    Blocked by gate 7
  9. 9

    Cybersecurity approval recorded

    blocked

    Named security approver signs off with evidence references.

    Approver role: CISO Office · Evidence: none attached
    Blocked by gate 8
  10. 10

    Operational approval recorded

    blocked

    Named operations approver signs off on continuity exit.

    Approver role: Plant Ops · Evidence: none attached
    Blocked by gate 9
  11. 11

    Reconnection authorised

    blocked

    Executive authorisation recorded; tunnel re-enabled under monitoring.

    Approver role: Executive · Evidence: none attached
    Blocked by gate 10

Continuity strategies in force

  • Manual EDI processing — releases & ASNs
    Scope SYS-05 / supplier EDI outage · RTO 8h · RPO 15m · manual capacity 220/day
    Portal upload of 830/862 and keyed ASN entry, 2 clerks per shift
    Last tested 2025-10-26
  • Supplier isolation and re-onboarding
    Scope SYS-18 partner connectivity · RTO 4h · RPO 0m · manual capacity 0/day
    Terminate tunnel, rotate credentials, stage clean-room re-entry
    Last tested 2026-01-18
  • SC Assembly body shop bank build-ahead
    Scope PLT-1 stamping shortage · RTO 24h · RPO 60m · manual capacity 180/day
    Run banked bodies, resequence Line SC-2 to the SX-2 mix
    Never tested — capacity figure is an assumption, not a proven capability