Next best move:Supply the inputs runout needs Next: Continuity options Atlas
AutoResilienceCommand
Ops clock2026-03-17 14:00ZFirst impactT−22.4h

BMW-targeted concept demonstration. Operational entities, suppliers, parts, inventory, production, financial values and incident conditions are synthetic and do not represent BMW systems, performance or current exposure.

Inventory runout timeline

Time is the primary axis. Every bar is calculated from records you can open, using assumptions you can change.

INC-2026-0113 · S1 · responding

Exposure cannot be fully determined. Missing information increases—not decreases—decision risk.

  • ▲1 affected part–line pairs have no inventory record. They are shown as unresolved, never as safe.

Hours to production interruption by line

now4h12h24h48h7d
  • Confirmedrunout 22.4h1,126 units · $46.4M
    PartUsableQuarantineSafetyInboundUse/hrRunoutStatusSource / as of
    98R-1225 Door inner panel A147604300 (excl.)6622.4hPossibleIntegration register 2026-01-19 · 2026-03-14 · validated
    14Z-1025 Door inner panel A· single-source1111092045.524.4hConfirmedContract schedule A · 2026-03-10 · validated
    Calculation for the driving part (98R-1225)
    1. Usable inventory = on hand 1906 − quarantined 0 − safety stock 430 = 1476 units
    2. Effective consumption = 64.3/hr × 1 × (1 + scrap 0.027 × 1) = 66/hr
    3. In-transit 449 units arrives in 25h, after stock runs out — excluded
    4. Hours to impact = (1476 + 0) ÷ 66 = 22.4h
  • Confirmedrunout 28.2h950 units · $26.0M
  • Confirmedrunout 28.3h1,024 units · $28.1M
  • Confirmedrunout 33.2h562 units · $29.7M
  • Possiblerunout 52.3h0 units · $0k
  • Confirmedrunout 59.2h0 units · $0k
  • Confirmedrunout 71.5h0 units · $0k
  • Probablerunout 84.4h0 units · $0k
usable stock confirmed inbound interruption window supplier recovery estimate alternate source available

Assumptions

Assumption changes recalculate every runout, line exposure and the operational exposure score immediately. The stored records are never overwritten.

Alternate sources & continuity

  • 27A-1000 → Northbend Castings
    qualified · activation 36h · 480/day · validated 2026-01-12
  • 14Z-1025 → Belmont Die Casting
    partial · activation 96h · 260/day · validated 2025-05-10
  • 40Y-1050 → Weyland Forge
    unqualified · activation 240h · 150/day · never validated
  • 40W-1100 → Grayson Machining
    qualified · activation 48h · 620/day · validated 2026-02-17
  • 99H-1007 → Cordoba Bearings
    partial · activation 72h · 340/day · validated 2025-09-08
  • Manual EDI processing — releases & ASNs
    RTO 8h · RPO 15m · capacity 220/day · tested 2025-10-26
  • Supplier isolation and re-onboarding
    RTO 4h · RPO 0m · capacity 0/day · tested 2026-01-18
  • SC Assembly body shop bank build-ahead
    RTO 24h · RPO 60m · capacity 180/day · never tested

Customer orders at risk

Build capacity before each due time, orders filled in due-date order.

  • PGM-3-4422Confirmed
    Delmar Auto Group · firm EDI release · Line SC-3 (chassis) · due T+66h
    246 of 458 units short · $6.7M

1 order(s) short · 246 units · $6.7M

Legend

Confirmed material impactProbable or imminentPossible / evidence gapResponse underwayValidated operationalUnknown / not assessed