Not part of a guided workflow —
Next best move:Open the platform atlas Atlas
AutoResilienceCommand
Ops clock2026-03-17 14:00ZFirst impactT−22.4h

BMW-targeted concept demonstration. Operational entities, suppliers, parts, inventory, production, financial values and incident conditions are synthetic and do not represent BMW systems, performance or current exposure.

Trusted data

Every input behind the 27A-1000 calculation, with its source, owner, trust state and whether it was used.

INC-2026-0113 · S1 · responding

Trust precedence in force

Configurable by data type and customer policy.

  1. 1. Physically verified
  2. 2. Independently corroborated
  3. 3. Trusted current
  4. 4. Last known good
  5. 5. Supplier reported
  6. 6. Stale
  7. 7. Assumption
  8. 8. Unknown

Potentially compromised data sits outside this order. It is blocked from every calculation until an executive authorization is recorded with a documented reason.

On-hand quantity at the line

Used: Physical cycle count at the line-side store — 0 units

Conflicting values
Potentially compromisedSupplier EDI 846 inventory advice260 unitsexcluded
Source systemSupplier EDI gateway
Source recordEDI 846 / SEQ-88214
Source time2026-03-16 22:30Z
Ingested2026-03-17 14:00Z
OwnerSupplier logistics
Confidence20%
Effective period2026-03-16 22:30Z → open
ValidationNone. Written after the estimated incident start.
BasisReceived from the supplier environment after the estimated compromise window began, and it disagrees with the physical count.
Excluded becausePotentially compromised. Blocked from calculation until an executive authorization is recorded.
Physically verifiedPhysical cycle count at the line-side store0 unitsused in calculation
Source systemManual count sheet
Source recordCYCLE-COUNT-SC-0412
Source time2026-03-17 12:30Z
Ingested2026-03-17 14:00Z
OwnerMaterials supervisor, synthetic SC Assembly
Confidence95%
Effective period2026-03-17 12:30Z → open
ValidationCounted and countersigned by two operators, photo attached.
BasisCounted physically inside the plant, outside any supplier system.
Last known goodPre-incident ERP stock snapshot40 unitsexcluded
Source systemERP (S/4HANA export)
Source recordMB52 / PRT-001
Source time2026-03-16 15:00Z
Ingested2026-03-17 14:00Z
OwnerPlant materials planning
Confidence70%
Effective period2026-03-16 15:00Z → 2026-03-16 21:00Z
ValidationSnapshot taken 6 hours before the estimated incident start.
BasisApproved last-known-good record, superseded by the physical count.
Excluded becauseSuperseded by physically verified data of higher precedence.

The supplier-fed figure is 260 units higher than the physical count. Using it would move the projected stop time and change which action is recommended.

Quarantined quantity

Used: Quality hold record — 0 units

Trusted currentQuality hold record0 unitsused in calculation
Source systemQuality management system
Source recordQN-4471 containment lot
Source time2026-03-16 18:00Z
Ingested2026-03-17 14:00Z
OwnerQuality engineering
Confidence90%
Effective period2026-03-16 18:00Z → open
ValidationHold raised in a manufacturer-owned system, unaffected by the supplier event.
BasisManufacturer-side system, not exposed to the supplier compromise.

Reserved / protected stock

Used: Safety-stock reservation — 170 units

Trusted currentSafety-stock reservation170 unitsused in calculation
Source systemERP (S/4HANA export)
Source recordSafety stock / PRT-001
Source time2026-03-16 08:00Z
Ingested2026-03-17 14:00Z
OwnerSupply-chain planning
Confidence85%
Effective period2026-03-16 08:00Z → open
ValidationPolicy parameter, unchanged during the event.
BasisManufacturer-owned planning parameter.

Unusable / damaged quantity

Used: Warehouse damage log — 0 units

StaleWarehouse damage log0 unitsused in calculation
Source systemWarehouse management
Source recordWM-DMG-2291
Source time2026-03-13 14:00Z
Ingested2026-03-17 14:00Z
OwnerInbound logistics
Confidence40%
Effective period2026-03-13 14:00Z → open
ValidationLast updated 96 hours ago. Older than the 24-hour freshness rule.
BasisUsed conservatively because no fresher record exists. Flagged as stale.

Scheduled consumption rate

Used: MES scheduled build rate — 91.8 units/hour

Conflicting values
Trusted currentMES scheduled build rate91.8 units/hourused in calculation
Source systemMES
Source recordSchedule / LN-1
Source time2026-03-17 12:00Z
Ingested2026-03-17 14:00Z
OwnerManufacturing engineering
Confidence90%
Effective period2026-03-17 12:00Z → open
ValidationLive manufacturer-owned execution system.
BasisCurrent production schedule from a manufacturer-owned system.
AssumptionPlanned rate with recorded scrap allowance92.8 units/hourexcluded
Source systemAutoResilience assumption
Source recordScrap uplift assumption
Source time2026-03-17 14:00Z
Ingested2026-03-17 14:00Z
OwnerAutoResilience method
Confidence50%
Effective period2026-03-17 14:00Z → open
ValidationNot validated. Used only to form the earliest-credible bound.
BasisAssumption, ranked below the trusted current schedule.
Excluded becauseSuperseded by trusted current data of higher precedence.

Confirmed inbound quantity

Used: Carrier gate scan plus driver manifest — 645 units

Independently corroboratedCarrier gate scan plus driver manifest645 unitsused in calculation
Source systemCarrier portal + gate house
Source recordPRO-77341 / gate scan
Source time2026-03-17 13:30Z
Ingested2026-03-17 14:00Z
OwnerInbound logistics
Confidence80%
Effective period2026-03-17 13:30Z → open
ValidationConfirmed by the carrier independently of the supplier network. ETA 8h.
BasisCorroborated outside the compromised supplier environment.

Unconfirmed shipment claimed by the supplier

Rule: unconfirmed shipments are never counted in verified available supply.

Supplier reportedSupplier email claiming a truck departed480 unitsexcluded
Source systemSupplier notification (email)
Source recordSupplier message 11:04
Source time2026-03-17 11:00Z
Ingested2026-03-17 14:00Z
OwnerSupplier account manager
Confidence30%
Effective period2026-03-17 11:00Z → open
ValidationNo ASN, no carrier PRO number, no gate scan.
BasisUnconfirmed. Excluded from verified available supply by rule even though the trust state alone would permit it.
Excluded becauseRule: unconfirmed shipments are never counted in verified available supply.

Planned units over the next 48 hours

Used: Production schedule for the horizon — 2208 units

Trusted currentProduction schedule for the horizon2208 unitsused in calculation
Source systemMES
Source recordProgram / PGM-1
Source time2026-03-17 12:00Z
Ingested2026-03-17 14:00Z
OwnerManufacturing planning
Confidence90%
Effective period2026-03-17 12:00Z → open
ValidationReleased schedule in a manufacturer-owned system.
BasisManufacturer-owned schedule.

Calculation trace

Every line names the source of its value.

  1. Usable inventory = on hand 0 − quarantined 0 − reserved 170 − unusable 0 = 0 units (on hand from Manual count sheet).
  2. Verified available supply = usable 0 + confirmed inbound 645 + approved transfer 0 = 645 units.
  3. Excluded from supply: 480 units claimed by the supplier without an ASN, carrier reference or gate scan.
  4. Time to impact = 645 ÷ 91.8/hr = 7h.
  5. Units exposed = planned 2208 − supportable 322 = 1886 units over 48h.

Input fingerprint 0/0/170/0/91.8/645/2208/0/u/h/. Any change to it invalidates approvals already recorded.